Qinghai Delingha 10MW CSP Power Station
In July 2013, it was connected to the grid for power generation through hydraulic working medium;
In August 2016, the two-hour energy storage transformation of
molten salt working medium was completed;
It is the first large-scale energy storage CSP power station in
China and the third one in the world;
The technical route of tower-type water/molten salt binary
working medium is adopted;
It is the only CSP power station that has been approved by the
National Development and Reform Commission for a feed-in tariff of
RMB 1.2/kWh;
It has been running stably for more than 9 years, and 97% of
the targets to be reached for power generation have been realized.