50MW CSP Station in Crete, Greece
The total investment exceeds RMB 1.5 billion;
It covers an area of 3.5 square kilometers, with a heliostat
field area of 390,000 square meters and an energy storage duration
of 5 hours;
Designed annual power output: 127 million kWh;
The project is equipped with 5MW PV power to make up for the
auxiliary power consumption.